Mapped (unverified)colocation
SEACOM Mtunzini CLS
Mtunzini, KwaZulu-Natal, South Africa
Source: Primary source
SEACOM Mtunzini CLS is a mapped data center in KwaZulu-Natal, South Africa. It runs on South Africa's grid, which was 82% fossil-fuelled at 699 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
699 gCO₂/kWh
Clean electricity
18%
Region
KwaZulu-Natal
Overview
source: linkSEACOM Limited — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
699 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: South Africa data centers.
In the news
source: Google News (local + English)- Djibouti Telecom to expand DARE1 subsea cable to South AfricaData Center Dynamics· Sep 3, 2025
- Djibouti Telecom to extend DARE1 cable from Kenya to South AfricaDeveloping Telecoms· Sep 1, 2025
- Massive Internet Outage Hits East Africa After Undersea Cable FailuresTechweez· May 12, 2024
- Where Facebook’s massive 2Africa cable will land in South AfricaMyBroadband· Jan 13, 2023
- You can now use T-kash to make payments via Mpesa and Airtel Money Till numbersBizna Kenya· Jul 4, 2022
- Seacom offers Kenya a route to South Africa's cloudConnecting Africa· Mar 20, 2019
See something wrong or missing on this page? Suggest a correction.