Skip to content
DataCentersExposed
Mapped (unverified)

Santander data center, Leicestershire, United Kingdom

Leicestershire, United Kingdom

Source: OpenStreetMap

Santander data center in Leicestershire, United Kingdom is a mapped facility, operated by Santander. DataCentersExposed has documented a 53,474 sq ft footprint and 1 environmental-permit record at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Santander
Operator
Santander
Est. capacity
~10-25 MW
Footprint
53,474 sq ft
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Leicestershire
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Santander is a mapped data center in the United Kingdom, operated by Santander. Available records report a footprint of 53,474 square feet. No ultimate parent above Santander is identified in the verified facts for this site.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%

National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.

Environmental permits

source: Permit register
  • SANTANDER UK PLCEPR/QP3533ED
    EPR permit · holder "SANTANDER UK PLC" · Blaby · Combustion; Any Fuel =>50MW - 1.1 A(1) a) · within ~2 km of the mapped site

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.