Skip to content
DataCentersExposed
Mapped (unverified)

Salle technique TF1

Île-de-France, France

Source: OpenStreetMap

Salle technique TF1 is a mapped data center in Île-de-France, France, operated by TF1. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
TF1
Operator
TF1
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Île-de-France
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Salle technique TF1 is a data center in France, mapped in available records and operated by TF1. Public records identify it only as a TF1 data center, with no parent company, capacity, or footprint figures disclosed. Ownership details above the operator are not available.

Operator chain

  • Ultimate parent
    TF1
  • Files as
    TF1
  • This facility
    Salle technique TF1

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh

A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: France data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.