Mapped (unverified)colocation
SÜC Datacenter 2
Coburg, Bayern, Germany
Source: Primary source
SÜC Datacenter 2 is a mapped data center in Bayern, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Bayern
Overview
source: linksuec//dacor GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Chiphersteller: Nvidia verdoppelt Umsatz und GewinnNeue Presse Coburg· Aug 26, 2026
- Künstliche Intelligenz: OpenAI plant neues Büro in Berlin – KI-Ausbau in DeutschlandNeue Presse Coburg· Aug 14, 2026
- Stromanschluss inklusive: Uniper will Rechenzentren an Kraftwerksstandorten ansiedelnNeue Presse Coburg· Aug 11, 2026
- Künstliche Intelligenz: Nvidia und Wall Street sammeln halbe Billion Dollar für KINeue Presse Coburg· Aug 10, 2026
- Künstliche Intelligenz: Börse zweifelt an Zuckerbergs KI-EuphorieNeue Presse Coburg· Jul 30, 2026
- Künstliche Intelligenz: Facebook-Konzern enttäuscht BörseNeue Presse Coburg· Jul 29, 2026
See something wrong or missing on this page? Suggest a correction.