Riot Platforms
Corsicana, Navarro County, TX
Source: Primary source
Riot Platforms is an operating data center in Navarro County, TX. DataCentersExposed has documented 400 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkConverting from Bitcoin to AI Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Amazon to invest $1B into data center communities amid backlash against data center rolloutsCorsicana Daily Sun· Oct 2, 2026
- CISD approves $4.25 million steel package for high school CTE expansioncorsicanadailysun.com· Sep 29, 2026
- Governor halts all data center permitsCorsicana Daily Sun· Sep 23, 2026
- KIDZ AI Secures Open Compute Project Membership to Advance Enterprise GPU Cloud Deployment and AI Data Center InfrastructureCorsicana Daily Sun· Sep 23, 2026
- Industry warns of blackouts, economic woes if Texas overreacts to data center, transmission line angerCorsicana Daily Sun· Aug 26, 2026
- Riot Platforms wins new $38.00 target at ATBCantech Letter· Aug 17, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Jose Antonio Navarro El in Corsicana, is 7.3 mi from this site (621 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.