Rekenhal is a mapped data center in Groningen, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Groningen
Overview
source: linkRekencentrum Rijksuniversiteit Groningen — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- CJ2 Hosting: Interesse voor regionale datacenterdiensten groeitNorthC Datacenters· Jul 21, 2026
- Eén Microsoft-datacenter gebruikt 1 procent van alle stroom in NederlandNOS· Jul 14, 2026
- Brand in datacentrum Almere treft huisartsen in Groningen en Drenthe. ‘Dit laat ook zien hoe kwetsbaar zorginstellingen zijn’DVHN· May 8, 2026
- Franse investeerder mag Nederlands datacenterbedrijf NorthC overnemenTweakers· Feb 9, 2026
- Techgiganten gaan honderden miljarden investeren in onder meer datacentersNOS· Feb 8, 2026
- Wat betekent het nieuwe datacenter van Google voor het zuiden van NederlandLoon-op-zand.nieuws.nl· Dec 23, 2025
See something wrong or missing on this page? Suggest a correction.