Mapped (unverified)
Redcentric Cambridge
Cambridge, Cambridgeshire, United Kingdom
Source: OpenStreetMap
Redcentric Cambridge is a mapped data center in Cambridgeshire, United Kingdom, operated by Redcentric. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Redcentric
Operator
Redcentric
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Cambridgeshire
Overview
source: linkRedcentric Cambridge is a mapped data center in Cambridge, United Kingdom, operated by Redcentric. Available records identify it only as a Redcentric data center, with no ultimate parent, capacity, or footprint figures disclosed.
Operator chain
- Ultimate parentRedcentric
- Files asRedcentric
- This facilityRedcentric Cambridge
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Urban data centre operator scales to 11 sites with Redcentric dealBusiness Sale Report· May 6, 2026
- Stellanor Acquires Eight UK Data Centres from RedcentricData Centre Magazine· May 5, 2026
- Stellanor completes acquisition of eight data centers from RedcentricPA Media· May 5, 2026
- Stellanor buys UK data centre from Imagination TechnologiesTelecompaper· Apr 9, 2026
- UK MSP Redcentric offloads data center business for £127mData Center Dynamics· Oct 23, 2025
- UK MSP Redcentric confirms talks to potentially sell data center businessData Center Dynamics· Aug 22, 2025
See something wrong or missing on this page? Suggest a correction.