Mapped (unverified)
Rechenzentrum Thüringer Netkom
Ilmenau, Thüringen, Germany
Source: OpenStreetMap
Rechenzentrum Thüringer Netkom is a mapped data center in Thüringen, Germany. DataCentersExposed has documented a 21,453 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-10 MW
Footprint
21,453 sq ft
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Thüringen
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Legendäre Eventwoche: Uni fehlen die Studis zum PartymacheninSüdthüringen· Jun 16, 2026
- ForLab stellt Kompetenzatlas vorWirtschaftsspiegel Thüringen· May 26, 2026
- Acht Millionen Euro für KI-SupercomputerMDR.de· Apr 9, 2026
- Thüringer Hochschulen: Acht Millionen Euro für KI-SupercomputerinSüdthüringen· Apr 9, 2026
- Millionenförderung: Thüringer Hochschulen erhalten neue HochleistungscomputerMDR.de· Mar 24, 2026
- Standortprofil Ilmenau: Wirtschaft und die größten UnternehmenDie Deutsche Wirtschaft· Mar 6, 2026