Mapped (unverified)colocation
R-KOM Datacenter
Regensburg, Bayern, Germany
Source: Primary source
R-KOM Datacenter is a mapped data center in Bayern, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Bayern
Overview
source: linkR-KOM GmbH — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Umstrittene Rechenzentren: Boom erreicht Bayern - Planungen in Nürnberg sind „sehr konkret“NN.de· Aug 29, 2026
- Pläne für Mega-Projekt: Kraftwerk soll Rechenzentrum versorgen und Stromnetz stabilisierenhessenschau.de· Aug 27, 2026
- Kommt ein 300-MW-Rechenzentrum nach Wenzenbach?DataCenter-Insider· Aug 11, 2026
- Wenzenbach bei Regensburg: Proteste gegen Pläne für eines der größten Rechenzentren EuropasSZ.de· Aug 4, 2026
- Kassenpatienten, Parkplatznot und Diebe an der Selbstscannerkasse: Was läuft schief?Mittelbayerische Zeitung· Aug 1, 2026
- Gefahr durch Rechenzentrum: Naturdenkmal soll den Abbachhof schützenMittelbayerische Zeitung· Jul 25, 2026
See something wrong or missing on this page? Suggest a correction.