Proposed

Quantica Big Sky

Broadview, Yellowstone County County, MT

Source: Primary source

Quantica Big Sky is a proposed data center in Yellowstone County County, MT, operated by Quantica Infrastructure. DataCentersExposed has documented 1,000 MW of reported power capacity at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Operator
Quantica Infrastructure
Power
1,000 MW
Attribution & capacity confidence:mediumprimary source

Overview

source: link

~5,000-acre campus N of Billings; 500MW initial to 1GW; construction 2026.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
867 ft
Unknown209912 · 115 kV
Transmission line
0.3 mi
115 kV line
Municipal water
Served
Broadview Town Of (modeled boundary)

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Broadview High School in Broadview, is 0.4 mi from this site (56 students). 3 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.