QTS Fayetteville (Project Excalibur)
Fayetteville, Fayette County County, GA
Source: Primary source
QTS Fayetteville (Project Excalibur) is a under construction data center in Fayette County County, GA, operated by QTS Realty Trust, LLC. DataCentersExposed has documented 250 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: link615-acre, up to 16 buildings; world's largest multi-tenant campus, buildout by 2032.
Operator chain
- Files asQTS Realty Trust, LLC
- This facilityQTS Fayetteville (Project Excalibur)
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Blackstone-owned QTS Data Centers looks to raise $4.6bn, starting with 10-year investment-grade green bond saleData Center Dynamics· Apr 10, 2026
- Blackstone Plans Public Company for AI Data-Center Buying SpreeBloomberg.com· Feb 27, 2026
- Blackstone lands a $2.05bn CMBS loan for QTS-sponsored data center portfolioPERE Credit· Feb 20, 2026
- Blackstone’s QTS Eyes $2.1B for Data Center TrioCommercialSearch· Feb 16, 2026
- Blackstone Real-Estate Fund Stages Comeback With Best Return in Three YearsWSJ· Jan 14, 2026
- Blackstone’s AI Powerhouse Goes On Without Its $3 Billion ManBloomberg.com· Jul 17, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Georgia reported $474.2M in High-Technology Data Center Equipment Sales and Use Tax Exemption (O.C.G.A. § 48-8-3(68.1)) for FY2025 (Georgia Department of Audits and Accounts (DOAA); economic analysis by UGA Carl Vinson Institute of Government). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Fayette County High School in Fayetteville, is 0.3 mi from this site (1,368 students). 3 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.