Mapped (unverified)
Pulsant data center, Stockton-on-Tees, United Kingdom
Stockton-on-Tees, United Kingdom
Source: OpenStreetMap
Pulsant data center in Stockton-on-Tees, United Kingdom is a mapped facility, operated by Pulsant. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Pulsant
Operator
Pulsant
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Stockton-on-Tees
Overview
source: linkPulsant is a mapped data center in the United Kingdom, operated by Pulsant. Details on its ultimate ownership, power capacity, and footprint are not disclosed in available records. The site is recorded here as a Pulsant data center, with further specifics yet to be documented.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Blackstone Terminates Huge Virginia Data Centre ProjectSilicon UK· Jul 6, 2026
- Pulsant's Mark Lewis on Data Sovereignty & AI InfrastructureData Centre Magazine· Jul 6, 2026
- Pulsant completes GBP £2 million data centre upgradeDataCentreNews UK· Jun 18, 2026
- Pulsant completes £2m upgrade to drive data centre productivitycapacityglobal.com· Jun 16, 2026
- Pulsant completes £500,000 Edinburgh data centre upgradesEdinburgh News· Jun 16, 2026
- ‘Scotland’s most connected data centre’ part of £500,000 upgrade moveThe Scotsman· Jun 16, 2026
See something wrong or missing on this page? Suggest a correction.