Pulsant Maidenhead
Maidenhead, Windsor and Maidenhead, United Kingdom
Source: OpenStreetMap
Pulsant Maidenhead is a mapped data center in Windsor and Maidenhead, United Kingdom, operated by Pulsant. DataCentersExposed has documented a 10,769 sq ft footprint at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkPulsant Maidenhead is a mapped data center in Maidenhead, United Kingdom, operated by Pulsant. Available records put its footprint at 10,769 square feet. No ultimate parent above Pulsant is disclosed in available records.
Operator chain
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Pulsant completes £2m upgrade to drive data centre productivitycapacityglobal.com· Jun 16, 2026
- ‘Scotland’s most connected data centre’ part of £500,000 upgrade moveThe Scotsman· Jun 16, 2026
- Regions can prosper from data centre growth at expense of London defaultTheBusinessDesk.com· May 26, 2026
- Pulsant Completes £10m Milton Keynes Data Centre UpgradeSilicon UK· Feb 10, 2026
- UK data centre operator launches high-density facility in Milton KeynesMKFM· Feb 9, 2026
- Pulsant launches £10m expansion of Milton Keynes data centerData Center Dynamics· Feb 9, 2026