Prometheus Hyperscale WY-1 (Evanston)

Evanston, Uinta County County, WY

Source: Primary source

Prometheus Hyperscale WY-1 (Evanston) is a proposed data center in Uinta County County, WY, operated by Prometheus Hyperscale. DataCentersExposed has documented 1,250 MW of reported power capacity at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Operator
Prometheus Hyperscale
Power
1,250 MW
Attribution & capacity confidence:mediumprimary source

Overview

source: link

506-acre near Evanston; 1.25GW to 5GW; islanded gas microgrid; CUP Jun 2026.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.5 mi
Unknown204371 · 115 kV
Transmission line
0.5 mi
115 kV line
Municipal water
Served
Evanston, City Of (modeled boundary)

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Wyoming reported $15.2M in Sales/use tax exemption for qualifying data processing services centers (W.S. § 39-15-105(a)(viii)(S)) for FY2021 (Wyoming Department of Revenue, Excise Tax Division (report to Joint Revenue Interim Committee)). Program-wide, not attributable to this site.

source · All Wyoming subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Clark Elementary in Evanston, is 0.5 mi from this site (198 students). 6 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.