Project Tango
Loxahatchee, Palm Beach County, FL
Source: Primary source
Project Tango is a under construction data center in Palm Beach County, FL.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Palm Beach, Florida
Project Tango in Loxahatchee, FL is contested. Petition: https://www.change.org/p/say-no-to-the-construction-of-project-tango-ai-data-center-in-palm-beach-county | Group: https://www.notoprojecttango.com/ | Group: https://www.facebook.com/groups/1359906715176907/ | Palm Beach County commissioners are expected to revisit the Project Tango proposal at a meeting scheduled for April 23, where potential zoning changes tied to the project will be considered Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkPalm Beach County zoning commission recommended approval of the plans in December 2025. Plans include a dedicated substation. At full build-out, estimated water use is about 5,000 gallons per day. Power will be provided by Florida Power & Light. Announced investment: $2.6B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- AI data center land partner asks judge to halt project as sides bickerThe Palm Beach Post· Jun 16, 2026
- Project Tango: New proposal could bypass public input, set countywide precedentWPTV· Jun 3, 2026
- Some neighbors say a Palm Beach County data center is too much. What's actually proposed.WPEC· May 4, 2026
- Photos Proposed data center site in western Palm Beach CountyThe Palm Beach Post· Apr 22, 2026
- Aerial video of proposed data center site in western Palm Beach CountyThe Palm Beach Post· Apr 22, 2026
- Palm Beach County postpones vote on future of AI data center Project Tango to JulyWPTV· Apr 10, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Loxahatchee Groves Elementary in Loxahatchee, is 4.5 mi from this site (653 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.