Project Sharka: Google Data Center
Midlothian, Ellis County, TX
Source: Primary source
Project Sharka: Google Data Center is a under construction data center in Ellis County, TX. DataCentersExposed has documented a 288,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkAnnounced investment: $0.88. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- AI data centre is a ‘dumb idea’ as campaign launchedMidlothian View· Jun 17, 2026
- South of Scotland MSP visits site of “monster” data centreMidlothian View· Jun 17, 2026
- Fears on AI centre allayed – but opposition remainsMidlothian View· Jun 5, 2026
- Plans for major new AI data centre on Borders agendaMidlothian View· May 27, 2026
- Grid Strategies Reports Examine Transmission Pricing for Large LoadsRTO Insider· May 11, 2026
- Forget GDP. Meet GDI: The new economic scorecard for AI powerBusiness Insider· Apr 10, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Juvenile Justice Alternative Ed Program/Venus in Venus, is 2.9 mi from this site (8 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.