Project Horizon
Fort Stockton, Pecos County, TX
Source: Primary source
Project Horizon is a proposed data center in Pecos County, TX, operated by Poolside/CoreWeave. DataCentersExposed has documented 2,000 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkPurpose: AI. Natural gas Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Files asPoolside/CoreWeave
- This facilityProject Horizon
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Poolside AI's 4B Texas Collapse: CoreWeave Out [2026]tech-insider.org· Apr 28, 2026
- CoreWeave Ends 2 GW Texas Data Center Deal With PoolsideMLQ.ai· Apr 4, 2026
- Poolside seeks partners for data center in Texas after CoreWeave deal falls apartData Center Dynamics· Apr 2, 2026
- Poolside hunts data centre partners after CoreWeave deal falls throughFinancial Times· Apr 1, 2026
- Amazon’s $12B Louisiana Data Center Push and Nuclear-Powered TexaThe National Law Review· Mar 5, 2026
- SOS Limited Announces Development of Tier III Modular Data Center at Longfellow Ranch, Texascitybiz· Dec 22, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Sanderson Schools in Sanderson, is 20.4 mi from this site (129 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.