Project Bus
Temple, Carroll and Haralson County, GA
Source: Primary source
Project Bus is a blocked data center in Carroll and Haralson County, GA, operated by AtlasEdge.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Carroll, Georgia
Project Bus in Temple, GA is contested. Petition: https://www.change.org/p/stop-data-center-from-being-built-in-carroll-county-georgia | Group: https://www.facebook.com/groups/cclandnlegacy/ | Group: https://www.facebook.com/groups/882581394736535/ | The Carroll County Anti-Data Center Coalition consists of local residents and officials opposing large-scale data center developments. Focused on protecting rural land, they argue these projects strain water/energy resources and threaten farmland preservation, with commissioners actively opposing new developments Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkRezoning application withdrawn Feb 2026 Announced investment: $11.0B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google NewsTax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Georgia reported $474.2M in High-Technology Data Center Equipment Sales and Use Tax Exemption (O.C.G.A. § 48-8-3(68.1)) for FY2025 (Georgia Department of Audits and Accounts (DOAA); economic analysis by UGA Carl Vinson Institute of Government). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Temple Elementary School in Temple, is 2.7 mi from this site (662 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.