PowerHouse
Chesterfield County, VA
Source: OpenStreetMap
PowerHouse is a mapped data center in Chesterfield County, VA. DataCentersExposed has documented a 278,050 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkPowerHouse is a mapped data center in Chesterfield County, Virginia, covering 278,050 square feet. The site draws power from Virginia Electric & Power Co and operates within the PJM grid. Public records reviewed here do not identify the facility's operator or its corporate parent, leaving the ownership chain behind the project unverified.
In the news
source: Google News- NextEra Deal Recasts Dominion Energy As Data Center And Renewables PowerhouseYahoo Finance· Jun 13, 2026
- Blackstone shows potential as data centre powerhouseBNN Bloomberg· Jun 8, 2026
- Data center developers dangle millions in perks for central Pa. townshipPennLive.com· Jun 4, 2026
- Saudi Arabia’s Data Center Market Is Moving From Promise to Powerhousevocal.media· Jun 3, 2026
- Joliet Residents Sue City and Developers Over Massive Data Center Project1340 WJOL· Jun 2, 2026
- Goodman Group’s (ASX:GMG) Transformation: From Industrial REIT to Global Data Centre PowerhouseKalkine· May 28, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~55 to 120 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Richmond), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Elizabeth Scott Elementary in Chester, is 1.2 mi from this site (781 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.