Mapped (unverified)colocation
PIX Samm Goiânia
Goiânia, Goiás, Brazil
Source: Primary source
PIX Samm Goiânia is a mapped data center in Goiás, Brazil. It runs on Brazil's grid, which was 11% fossil-fuelled at 110 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
110 gCO₂/kWh
Clean electricity
89%
Region
Goiás
Overview
source: linkG8 — colocation facility (11 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
110 gCO₂/kWh
Clean electricity
89%
Fossil electricity
11%
National grid context, not this facility's own metering. Full country picture: Brazil data centers.
In the news
source: Google News (local + English)- Centro de IA da Universidade Federal de Goiânia receberá R$ 78 miCorreio Braziliense· Jun 26, 2026
- Goiânia investe R$ 26,8 milhões na atualização do data center e se prepara para uso de IATribuna do Planalto· Apr 14, 2026
- Com data center inédito no Brasil, UFG será referência em computação de alto desempenhoJornal UFG· Dec 4, 2025
- Everest Digital: Data center goiano é destaque em estudo de caso europeustgnews.com.br· Jul 21, 2025
- "Goiás saiu na frente", diz Vanderlan Cardoso, relator da regulamentação de data centers no SenadoJornal Opção· Jun 13, 2025
- Goiás terá 1º supercomputador de IA da Latam com GPU NVIDIA Blackwell B200Canaltech· Mar 27, 2025
See something wrong or missing on this page? Suggest a correction.