Mapped (unverified)colocation
PIPE Networks Hobart
Hobart, Tasmania, Australia
Source: Primary source
PIPE Networks Hobart is a mapped data center in Tasmania, Australia, operated by Vocus. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Vocus
Operator
Vocus
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Tasmania
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkVocus Group — colocation facility (2 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)No recent coverage found for this facility.
See something wrong or missing on this page? Suggest a correction.