PhoenixNAP AMSTERDAM
Haarlem, Noord-Holland, Netherlands
Source: Primary source
PhoenixNAP AMSTERDAM is a mapped data center in Noord-Holland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Noord-Holland
Overview
source: linkPhoenixNAP — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Haarlem is miljoenen extra kwijt aan laptops en smartphones voor ambtenaren. ’Opkomst AI doet prijzen stijgen’Noordhollands Dagblad· Jun 3, 2026
- Datacenter in Vijfhuizen moet nog negen jaar wachten op stroomaansluiting, boze investeerder vist achter het netHaarlems Dagblad· Apr 30, 2026
- Wat nu speelt: rechter weigert aansluiting datacenter en redemptieverzoeken bij BouwinvestVastgoedmarkt· Apr 30, 2026
- Netbeheerder hoeft datacenter niet aan te sluiten op overvol stroomnetNU· Apr 29, 2026
- Netbeheerder Tennet hoeft datacenter niet direct aan te sluiten op overvol stroomnetNOS· Apr 29, 2026
- Datacenter stapt naar rechter om stroom: aansluiting of dwangsomNOS· Apr 18, 2026