Penta Infra Leeuwarden LEE02 is a mapped data center in Fryslân, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Fryslân
Overview
source: linkPenta C.V. — colocation facility (9 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Nieuwe locatie Switch Datacenters in Uithoorn levert restwarmte aan glastuinbouwTelecompaper· Jul 21, 2026
- Fritom Group in Sneek ontwikkelt razendsnel app na brand datacentrum Almere. ‘Gigantisch veel last van’Leeuwarder Courant· May 8, 2026
- Behoud Hounspolder cruciaal in collegevormingLiwwadders· Jan 27, 2026
- Regenwater als koelwater: Agriport A7 zet waterbank in voor datacenters én kassenH2O/Waternetwerk· Dec 17, 2025
- Groen licht voor bouw datacenter in AlmereTelecompaper· Jul 10, 2025
- Nationale Datacenterdag: datacenters openen deuren voor publiekComputable.nl· May 23, 2024
See something wrong or missing on this page? Suggest a correction.