Peak 10 Incorporated
mNSR Henrico County County, VA
Source: Primary source
Peak 10 Incorporated is an operating data center in mNSR Henrico County County, VA.
Reporting by Eric Keller · Updated Jun 12, 2026
Overview
source: linkVirginia data center with an issued DEQ diesel-generator air permit (mNSR).
In the news
source: Google News- Planning And Zoning Commission Releases Text Of Revised Data Center OrdinanceThe Harrodsburg Herald· Jul 10, 2026
- 6 Best Energy Stocks for the AI Power Grid Buildout | Investing | U.S. NewsUS News Money· Jun 18, 2026
- AI Data Centers Become City-Scale Infrastructure, Prompting New Industry PlaybookEngineering News-Record· Jun 17, 2026
- Qualcomm Has Fallen 26% From Its 2026 High. Could the June 24 Investor Day Be the Turning Point?TIKR.com· Jun 10, 2026
- AI Power Boards and SiC Grid to Aid Navitas Semiconductor's ProspectsTradingView· Jun 2, 2026
- Qualcomm (QCOM) Stock Soars to Record Peak Fueled by AI Data-Center PushBlockonomi· May 12, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Environmental permits
source: Permit register- VA DEQ air permit (minor NSR)52299Diesel backup-generator air permit. Program: mNSR. Reg. 52299.
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.