Mapped (unverified)colocation
partimus Rechenzentrum Bad Oeynhausen
Bad Oeynhausen, Nordrhein-Westfalen, Germany
Source: Primary source
partimus Rechenzentrum Bad Oeynhausen is a mapped data center in Nordrhein-Westfalen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Nordrhein-Westfalen
Overview
source: linkpartimus GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Nach Eröffnung von neuem KI-Zentrum: Wie Betriebe sofort aber sinnvoll Künstliche Intelligenz nutzenWestfalen-Blatt· Jun 20, 2026
- Balda Medical GmbH & Co. KG (Bad Oeynhausen) im Ranking der deutschen Top-UnternehmenDie Deutsche Wirtschaft· Apr 30, 2026
- 100-Millionen-Bau: Rechenzentrum wirft in Bad Lippspringe Fragen aufNeue Westfälische· Mar 14, 2026
- Neubau Yexio-Rechenzentrum: Bad Lippspringe hofft auf die GewerbesteuerWestfalen-Blatt· Mar 13, 2026
- 60-Millionen-Euro-Projekt: Neue Batteriespeicher in Bad Lippspringe fördern EnergiewendeNeue Westfälische· Sep 17, 2025
- Spatenstich für ein digitales Zukunftsprojekt in Bad LippspringeWestfalen-Blatt· Apr 9, 2025
See something wrong or missing on this page? Suggest a correction.