Orange Polska // Warszawa is a mapped data center in województwo mazowieckie, Poland, operated by Orange. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Oct 13, 2026
Real parent
Orange
Operator
Orange
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo mazowieckie
Overview
source: linkOrange Polska Spolka Akcyjna — colocation facility (13 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Pod Warszawą budują centrum danych. Mieszkańcy: już dziś są braki wody!Wykop· Aug 18, 2026
- T-Mobile ma nowe Data Center w WarszawieTelepolis.pl· Dec 19, 2024
- Orange Polska uruchamia pod Warszawą centrum danychsatkurier.pl· Oct 14, 2021
- Orange Polska uruchamia pod Warszawą gigantyczne centrum danych. Nowoczesne serwery i sieć ułatwią rozwój usług opartych na 5GNewseria BIZNES· Oct 14, 2021
- Google Cloud otwiera Region Google Cloud Warszawa i buduje 3 data center w PolsceITwiz· Sep 27, 2019
- Data center moratorium fight plays out in Benton County courtroomKY3· Sep 2, 2026