Mapped (unverified)colocation
Oceanet Armor B
Saint-Herblain, Pays de la Loire, France
Source: Primary source
Oceanet Armor B is a mapped data center in Pays de la Loire, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Pays de la Loire
Overview
source: linkGroupe Oceanet Technology — colocation facility (9 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- VIDÉO. 75 milliards investis pour des datacenters : pourquoi l’électricité française est-elle aussi attractive ?Ouest-France· Jun 1, 2026
- Le nantais Etix Everywhere élargit son réseau de data centers de proximité en FranceLe Journal des Entreprises· Apr 2, 2024
- Ressources humaines. Abalone France prévoit d'ouvrir 14 agences d'intérim en 2022Ouest-France· Sep 22, 2021
- L'intégrateur Iliane s'installe à Saint-Herblain sur 2000 m2Le Monde Informatique· Jun 20, 2016
See something wrong or missing on this page? Suggest a correction.