Mapped (unverified)colocation
NTT Sonezaki Data Center(Dojima Campus)
Osaka-Shi Kita-Ku, Osaka, Japan
Source: Primary source
NTT Sonezaki Data Center(Dojima Campus) is a mapped data center in Osaka, Japan. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Osaka
Overview
source: linkNTT SmartConnect Corporation — colocation facility (19 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)See something wrong or missing on this page? Suggest a correction.