Mapped (unverified)colocation
NTT Nipponbashi Data Center(Dojima Campus)
Osaka, Osaka, Japan
Source: Primary source
NTT Nipponbashi Data Center(Dojima Campus) is a mapped data center in Osaka, Japan. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Osaka
Overview
source: linkNTT SmartConnect Corporation — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- 【開発】大阪・咲洲でデータセンター、シンガポールSCキャピタル日経不動産マーケット情報· Jun 16, 2026
- Oracle Cloud Infrastructure(OCI)/東京・大阪リージョン – 概要/価格/マニュアル/トライアル/事例Oracle Blogs· May 14, 2026
- 大阪堺データセンターを活用した「Gemini on Google Distributed Cloud」のトライアル提供開始KDDI ニュースルーム· Apr 30, 2026
- KDDIがオンプレミス版Geminiのトライアル開始、大阪堺データセンターを活用ビジネスネットワーク· Apr 30, 2026
- NTTデータGの国内データセンター続々、世界水準仕様でIT大手の需要狙う日経クロステック· Apr 28, 2026
- ソフトバンクグループの孫正義氏、AI基盤強化へ:大阪に日本最大級の蓄電池生産ラインを建設、データセンターに電力供給finance.biggo.jp· Apr 24, 2026
See something wrong or missing on this page? Suggest a correction.