NTT Nipponbashi Data Center(Dojima Campus) is a mapped data center in Osaka, Japan. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Osaka
Overview
source: linkNTT SmartConnect Corporation — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- 関西電力、大阪府箕面市にデータセンター新設 29年にも完成日本経済新聞· Aug 26, 2026
- 『OSAKA I PJ解体工事』大阪・京橋OBP 富士通 関西システムラボラトリ解体が進む。現地の最新状況 26.07再都市化· Jul 20, 2026
- MCデジタル・リアルティとNTTスマートコネクトが、大阪エリアにおけるAIインフラ利便性強化に向けた連携に合意PR TIMES· Jul 7, 2026
- NTTスマートコネクト、大阪近郊エリアで新たなデータセンター間接続サービスを提供クラウド Watch· Jun 30, 2026
- 大阪近郊エリアにおける新たなデータセンター間接続(DCI)サービスの提供開始について~データセンター・DCIを軸としたデジタルインフラ事業の拡大~ | NTTスマートコネクト株式会社のプレスリリースPR TIMES· Jun 29, 2026
- NTTスマートコネクト、大阪近郊でDCIサービスを開始--データセンター接続基盤を強化ZDNET Japan· Jun 29, 2026
See something wrong or missing on this page? Suggest a correction.