Mapped (unverified)colocation
NTT Berlin 2 Data Center (BER2)
Berlin, Berlin, Germany
Source: Primary source
NTT Berlin 2 Data Center (BER2) is a mapped data center in Berlin, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Berlin
Overview
source: linkNTT DATA's Global Data Centers division — colocation facility (11 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Weitere Mittel für neues Super-Rechenzentrum in Adlershof - NewsTechnologiepark Adlershof· Sep 25, 2026
- Arnstein: Bekommt Arnstein ein Rechenzentrum? Bürgermeister Sauer reiste mit ersten Ideen im Gepäck nach BerlinMain-Post· Sep 21, 2026
- Linklaters, GSK, Greenberg und Heuking beraten zu Gigawatt-Rechenzentrumjuve.de· Sep 18, 2026
- Berlin & Brandenburg: Grüne und Umweltverbände sehen Risiken in Rechenzentrenn-tv.de· Sep 14, 2026
- Staatsbesuch in Berlin: VAE forcieren KI-, Cyber- und Rechenzentrumskooperation mit Deutschlandit boltwise· Sep 10, 2026
- Künstliche Intelligenz: Wo in Deutschland neue Rechenzentren entstehenSZ.de· Aug 28, 2026
See something wrong or missing on this page? Suggest a correction.