NorthC Nürnberg 1
Nürnberg, Bayern, Germany
Source: OpenStreetMap
NorthC Nürnberg 1 is an operating data center in Bayern, Germany, operated by NorthC. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: linkNorthC Nürnberg 1 is a mapped data center in Nürnberg, Germany, operated by NorthC. Available records identify it as a NorthC data center but disclose no capacity, footprint, or ultimate parent. Further details on ownership and environmental impact are not listed in the available record.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Mission Possible: Levigo löst besondere Fälle zusammen mit NorthCNorthC Datacenters· Aug 9, 2026
- IP-Exchange wird zu NorthC Deutschland GmbHNorthC Datacenters· Jul 26, 2026
- Von Cloud-first zu Cloud-smart: LEONI setzt auf NorthCconnect-professional· Dec 4, 2025
- NorthC baut auf dem Campus uptownBasel das Rechenzentrum der ZukunftNorthC Datacenters· Sep 11, 2025
- Data-Center für die Region: NorthC will ab 2026 im Gewerbegebiet bauenOP Online· Jul 12, 2025
- Colt Technology Services verkauft Rechenzentren an NorthCChannelPartner.de· Apr 25, 2025