NorthC München 2
München, Bayern, Germany
Source: OpenStreetMap
NorthC München 2 is an operating data center in Bayern, Germany, operated by NorthC. DataCentersExposed has documented a 51,990 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: linkNorthC München 2 is a mapped data center in München, Germany, operated by NorthC. Available records put its footprint at 51,990 square feet. Ownership above NorthC is not disclosed in the facts on file, and no operational details beyond its mapped status are recorded.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Mehr Standorte, Nähe, Resilienz: NorthC verbindet die SchweizSwiss IT Magazine· Oct 1, 2026
- NorthC plant sechstes Schweizer Rechenzentrum in BaselDataCenter-Insider· Aug 20, 2026
- NorthC Schweiz AG ernennt Urs Bürgisser zum Managing DirectorMoneycab· Aug 17, 2026
- Nachfrage für Datacenter gibt esImmobilien Zeitung· Jul 30, 2026
- NorthC: Auf dem Weg zur CO2-Neutralität - Innovativer Ansatz für Nachhaltigkeit in RechenzentrenNorthC Datacenters· Jul 26, 2026
- IP-Exchange wird zu NorthC Deutschland GmbHNorthC Datacenters· Jul 26, 2026