Mapped (unverified)colocation
noris network datacenter.de MUC5
Aschheim, Bayern, Germany
Source: Primary source
noris network datacenter.de MUC5 is a mapped data center in Bayern, Germany, operated by noris network. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
noris network
Operator
noris network
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Bayern
Overview
source: linknoris network AG — colocation facility (11 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentnoris network
- Files asnoris network
- This facilitynoris network datacenter.de MUC5
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Der Energiehunger der (KI-)Rechenzentren ist nur ein ÜbergangDataCenter-Insider· Jul 2, 2026
- Souveräne Cloud: Versa kooperiert bei SASE mit noris networkdigitalbusiness-magazin.de· Jun 17, 2026
- O2 Telefónica setzt auf Colocation von noris networkPresseBox· Nov 7, 2025
- Erster Nutzer: BayLfSt zieht in neues Rechenzentrum von noris network einPresseBox· Sep 26, 2025
- Digitalisierung: Neuer Standort für Elster in AschheimSZ.de· Sep 3, 2024
- noris network erweitert IaaS-Angebotit-daily· Dec 15, 2020
See something wrong or missing on this page? Suggest a correction.