Mapped (unverified)colocation
nLighten Nuremberg NUE1
Nuremberg, Bayern, Germany
Source: Primary source
nLighten Nuremberg NUE1 is a mapped data center in Bayern, Germany, operated by nLighten. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
nLighten
Operator
nLighten
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Bayern
Overview
source: linknLighten HQ BV — colocation facility (4 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Noris Network und Nlighten gewinnen Eco-AwardDataCenter-Insider· Jun 11, 2026
- Nlighten speist Abwärme in Wärmenetz im Synergiepark einDataCenter-Insider· Mar 10, 2026
- AEW kauft Rechenzentrum in Nürnberg von AventosDataCenter-Insider· Feb 24, 2026
- Nlighten setzt auf dezentrale Infrastruktur für industrielle KIDataCenter-Insider· Aug 1, 2025
- Noris Network nimmt Co-Location-Betrieb für die Stadt Nürnberg aufDataCenter-Insider· Jun 13, 2024
- Noris Network nimmt Bauabschnitt 2 vom Rechenzentrum Nürnberg Süd in BetriebDataCenter-Insider· Aug 12, 2022
See something wrong or missing on this page? Suggest a correction.