Mapped (unverified)colocation
Nj1
Nanjing, China
Source: Primary source
Nj1 is a mapped data center in China. It runs on China's grid, which was 58% fossil-fuelled at 526 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
526 gCO₂/kWh
Clean electricity
42%
Region
China
Overview
source: linkPrinceton Digital Group — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
526 gCO₂/kWh
Clean electricity
42%
Fossil electricity
58%
National grid context, not this facility's own metering. Full country picture: China data centers.
In the news
source: Google News (local + English)- 2026物理AI与世界模型大会即将在宁启幕caiwennews.com· Oct 8, 2026
- 108亿元!一大型数据中心项目落地安徽芜湖https://www.itdcw.com/· Oct 4, 2026
- Under the Waves, China Bets on Cooler Computing for AIThe Nanjinger· Sep 24, 2026
- 算电协同 能效先行数智赋能|南京亚派科技亮相2026 PT通信展C114通信网· Sep 24, 2026
- 江苏AI4S公共算力中心在南京建邺揭牌东方财富· Sep 3, 2026
- 中国移动长三角(南京)科创中心一期AB片区江苏省委新闻网· Sep 2, 2026
See something wrong or missing on this page? Suggest a correction.