NEXTDC M3 Melbourne Data Centre
Victoria, Australia
Source: OpenStreetMap
NEXTDC M3 Melbourne Data Centre is an operating data center in Victoria, Australia, operated by NEXTDC. DataCentersExposed has documented a 150,948 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
NEXTDC
Operator
NEXTDC
Est. capacity
~30-65 MW
Footprint
150,948 sq ft
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Victoria
Overview
source: linkNEXTDC M3 Melbourne Data Centre is a mapped data center in Australia, operated by NEXTDC. Available records put its footprint at 150,948 square feet. No ultimate parent above NEXTDC is identified in the available facts.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- NextDC lifts contracted capacity 137% in H1Telecompaper· Aug 28, 2026
- NextDC’s Craig Scroggie warns data centre costs facing ‘more uncertainty’Capital Brief· Aug 28, 2026
- Australia data centre firm NextDC reports rising water, energy use with profit beatReuters· Aug 28, 2026
- NextDC boss says data centre build times will halve to nine monthsAFR· Aug 28, 2026
- NextDC heralds FY26 as ‘record’ yearARNnet· Aug 28, 2026
- National Cabinet debates AI data centre rulesABC News & Headlines – Australian Broadcasting Corporation· Aug 26, 2026
See something wrong or missing on this page? Suggest a correction.