Mapped (unverified)
NEXTDC Kuala Lumpur Data Centre (KL1)
Petaling Jaya, Selangor, Malaysia
Source: OpenStreetMap
NEXTDC Kuala Lumpur Data Centre (KL1) is a mapped data center in Selangor, Malaysia, operated by NEXTDC. DataCentersExposed has documented a 69,117 sq ft footprint at this site. It runs on Malaysia's grid, which was 79% fossil-fuelled at 603 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
NEXTDC
Operator
NEXTDC
Est. capacity
~10-30 MW
Footprint
69,117 sq ft
Grid carbon
603 gCO₂/kWh
Clean electricity
21%
Region
Selangor
Overview
source: linkNEXTDC Kuala Lumpur Data Centre (KL1) is a data center in Petaling Jaya, Malaysia, operated by NEXTDC and listed in records as a NEXTDC Sdn Bhd facility. Its reported footprint is 69,117 square feet. Ownership above NEXTDC is not detailed in available records.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
603 gCO₂/kWh
Clean electricity
21%
Fossil electricity
79%
National grid context, not this facility's own metering. Full country picture: Malaysia data centers.
In the news
source: Google News (local + English)- Data centre push powers profit surge, shareholder returnsThe Edge Malaysia· Aug 16, 2026
- PJ data centre not proceedingThe Star· Aug 1, 2026
- Outcry over PJ data centre planThe Star· Jul 27, 2026
- Cabinet to discuss proposed data centre after Ramanan objectsFree Malaysia Today· Jul 17, 2026
- What Is NEXTDC’s KL1? Inside the RM2.8 billion AI-ready data centre transforming Malaysia’s digital ambitionsSinar Daily· May 25, 2026
- What data centre operators in Malayisa are actually building nowTech Wire Asia· May 19, 2026
See something wrong or missing on this page? Suggest a correction.