Mapped (unverified)
NEXTDC Kuala Lumpur Data Centre (KL1)
Petaling Jaya, Selangor, Malaysia
Source: OpenStreetMap
NEXTDC Kuala Lumpur Data Centre (KL1) is a mapped data center in Selangor, Malaysia, operated by NEXTDC. DataCentersExposed has documented a 69,117 sq ft footprint at this site. It runs on Malaysia's grid, which was 79% fossil-fuelled at 603 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
NEXTDC
Operator
NEXTDC
Est. capacity
~10-30 MW
Footprint
69,117 sq ft
Grid carbon
603 gCO₂/kWh
Clean electricity
21%
Region
Selangor
Overview
source: linkNEXTDC Kuala Lumpur Data Centre (KL1) is a data center in Petaling Jaya, Malaysia, operated by NEXTDC and listed in records as a NEXTDC Sdn Bhd facility. Its reported footprint is 69,117 square feet. Ownership above NEXTDC is not detailed in available records.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
603 gCO₂/kWh
Clean electricity
21%
Fossil electricity
79%
National grid context, not this facility's own metering. Full country picture: Malaysia data centers.
In the news
source: Google News (local + English)- NEXTDC launches 65MW AI data centre in Malaysia, expands Southeast Asia footprintET Datacenters· May 16, 2026
- NEXTDC launched its first Southeast Asia data centre in Kuala LumpurTech Wire Asia· May 15, 2026
- NextDC brings data center near Kuala Lumpur, Malaysia, onlineData Center Dynamics· May 15, 2026
- NEXTDC launches 65MW AI data center in Malaysia; marks expansion into Southeast AsiaW.Media· May 15, 2026
- Keeping data centres in checkThe Star· May 15, 2026
- NEXTDC launches first overseas data center in Kuala LumpurCRN Asia· May 15, 2026
See something wrong or missing on this page? Suggest a correction.