Mapped (unverified)
Next-MIC DataCenter
Kagoshima, Japan
Source: OpenStreetMap
Next-MIC DataCenter is a mapped data center in Kagoshima, Japan. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Kagoshima
Overview
source: link南日本情報処理センター data center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- Unpacking claim Michigan Gov. Gretchen Whitmer was caught on 'hot mic' dismissing data center concernsSnopes· Jun 16, 2026
- Whitmer poses next to OpenAI CEO for Michigan data center groundbreaking – drawing ireMLive.com· Jun 2, 2026
- New connection policy for data centres in IrelandArthur Cox LLP· Dec 16, 2025
- CRU Publishes Long Awaited Final Policy on Data Centre ConnectionsWilliam Fry· Dec 15, 2025
See something wrong or missing on this page? Suggest a correction.