Mapped (unverified)colocation
Netia Poznań (POZNH003)
Poznan, województwo wielkopolskie, Poland
Source: Primary source
Netia Poznań (POZNH003) is a mapped data center in województwo wielkopolskie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo wielkopolskie
Overview
source: linkNetia S.A. — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Making infrastructure part of the local ecosystem and communitycapacityglobal.com· Jun 1, 2026
- Poland’s Poznan University of Technology Unveils IQM Quantum Computer to Drive Research and EducationHPCwire· May 26, 2026
- Turning data centre waste heat into a valuable resourcecapacityglobal.com· Dec 9, 2025
- Orca partners with PCSS for Nvidia-supported quantum AI integrationData Center Dynamics· Sep 18, 2025
- ORCA Computing Demonstrates Distributed Photonic Quantum Neural Network in Collaboration with PCSS and NVIDIAQuantum Computing Report· Sep 17, 2025
- Beyond.pl’s Nvidia-powered F.I.N. supercomputer goes live at Poznan data centerData Center Dynamics· Sep 4, 2025
See something wrong or missing on this page? Suggest a correction.