Skip to content
DataCentersExposed
Mapped (unverified)colocation

Netia Data Center MIND

Jawczyce, województwo mazowieckie, Poland

Source: Primary source

Netia Data Center MIND is a mapped data center in województwo mazowieckie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
Operator
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo mazowieckie
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Netia S.A. — colocation facility (9 networks present). Source: PeeringDB.

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh

A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Poland data centers.

See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.