Mapped (unverified)colocation
Netia Data Center MIND
Jawczyce, województwo mazowieckie, Poland
Source: Primary source
Netia Data Center MIND is a mapped data center in województwo mazowieckie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo mazowieckie
Overview
source: linkNetia S.A. — colocation facility (9 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Nowe centrum danych pod Warszawą. Moc rośnie o 10 MWPropertyNews.pl· Apr 9, 2026
- W podwarszawskich Jawczycach powstanie drugi z obiektów kampusu Data4PropertyNews.pl· Oct 22, 2023
- Data4 oficjalnie otworzył pierwsze centrum danych w PolsceITwiz· May 26, 2023
- Grupa Data4 uruchamia pierwsze centrum danych w Polsce w Jawczycach k. Warszawyitreseller.pl· May 24, 2023
- Chmura za miliard złotych. Takich inwestycji jest w okolicach Warszawy coraz więcejWarszawa.Wyborcza.pl· May 23, 2023
- The French connectionEurobuildCEE· Apr 15, 2026
See something wrong or missing on this page? Suggest a correction.