Mapped (unverified)
Neom Hyper Scale Data Center
Tabuk, Saudi Arabia
Source: OpenStreetMap
Neom Hyper Scale Data Center is a mapped data center in Tabuk, Saudi Arabia. DataCentersExposed has documented a 606,677 sq ft footprint at this site. It runs on Saudi Arabia's grid, which was 98% fossil-fuelled at 692 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~120-250 MW
Footprint
606,677 sq ft
Grid carbon
692 gCO₂/kWh
Clean electricity
2%
Region
Tabuk
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
692 gCO₂/kWh
Clean electricity
2%
Fossil electricity
98%
National grid context, not this facility's own metering. Full country picture: Saudi Arabia data centers.
In the news
source: Google News (local + English)- Hot Regions Drive Liquid Cooling Adoption for AI Data CentersET Datacenters· Jul 18, 2026
- Data Center Painting, Coatings & ESD Flooring Market Size, Share, TrendsMarketsandMarkets· Jun 2, 2026
- NEOM’s Bold Cognitive Urban Infrastructure PushAI CERTs· May 2, 2026
- Desert Bytes: Why Gulf AI Ambitions Must Align with Energy and Water RealitiesMiddle East Council on Global Affairs· Apr 9, 2026
- LG bets on AI data center, ESS as future growth driverThe Korea Times· Mar 18, 2026
- NEOM in 2026: What Is Actually Being Built, What Was Scrapped, and What Comes Nexthouseofsaud.com· Feb 27, 2026
See something wrong or missing on this page? Suggest a correction.