Mapped (unverified)
Neom Hyper Scale Data Center
Tabuk, Saudi Arabia
Source: OpenStreetMap
Neom Hyper Scale Data Center is a mapped data center in Tabuk, Saudi Arabia. DataCentersExposed has documented a 606,677 sq ft footprint at this site. It runs on Saudi Arabia's grid, which was 98% fossil-fuelled at 692 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~120-250 MW
Footprint
606,677 sq ft
Grid carbon
692 gCO₂/kWh
Clean electricity
2%
Region
Tabuk
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
692 gCO₂/kWh
Clean electricity
2%
Fossil electricity
98%
National grid context, not this facility's own metering. Full country picture: Saudi Arabia data centers.
In the news
source: Google News (local + English)- Humain breaks ground on Neom’s Oxagon data centerData Center Dynamics· Sep 7, 2026
- Leap’s first two days bring in a string of data center agreementsEnterpriseAM· Sep 2, 2026
- Saudi Arabia’s Sovereign AI Backbone: Bridging Inland Hyperscale Demand and Coastal InnovationConstruction Review· Sep 1, 2026
- Saudi Arabia Data Center Market Size & Forecast to 2034IMARC Group· Aug 31, 2026
- Saudi Arabia Begins Construction of NEOM's $5 Billion AI Data CenterKonsulteer· Aug 5, 2026
- Hot Regions Drive Liquid Cooling Adoption for AI Data CentersET Datacenters· Jul 18, 2026
See something wrong or missing on this page? Suggest a correction.