Mapped (unverified)colocation
Nago Mirai2 Data Center
Nago, Okinawa, Japan
Source: Primary source
Nago Mirai2 Data Center is a mapped data center in Okinawa, Japan. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Okinawa
Overview
source: linkQualysite Technologies Inc. — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- データセンター特需に沸く‟すべり軸受け"、大同メタルの名物会長が「生産能力3割増では済まない」と豪語する理由東洋経済オンライン· Jul 30, 2026
- 分散型AIデータセンター、沿線に光ファイバーを持つ鉄道会社が協力:ニュース中日BIZナビ· Jul 21, 2026
- 名古屋市内に新たなデータセンターおよび接続拠点を開設~CNCI・JPIX・アット東京INTERNET Watch· Jul 9, 2026
- CNCI、JPIX、アット東京の3社、名古屋市内に新たなデータセンターおよび接続拠点を開設Data Center Cafe· Jul 9, 2026
- コミュニティネットワークセンター・JPIX・アット東京 3社共同で名古屋市内に新たなデータセンター・接続拠点を開設PR TIMES· Jul 8, 2026
- CNCIなど3社共同で名古屋市内にデータセンター開設電波タイムズ· Jul 8, 2026
See something wrong or missing on this page? Suggest a correction.