Mapped (unverified)colocation
MTP Sites Leon Edge
León, Guanajuato, Mexico
Source: Primary source
MTP Sites Leon Edge is a mapped data center in Guanajuato, Mexico. It runs on Mexico's grid, which was 74% fossil-fuelled at 474 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
474 gCO₂/kWh
Clean electricity
26%
Region
Guanajuato
Overview
source: linkMTP Sites — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
474 gCO₂/kWh
Clean electricity
26%
Fossil electricity
74%
National grid context, not this facility's own metering. Full country picture: Mexico data centers.
In the news
source: Google News (local + English)- ¿NVIDIA abrirá un centro de datos de IA en Nuevo León? Esto sabemosMSN· Jun 4, 2026
- Las advertencias de León XIV sobre la IA llegan en pleno auge de los centros de datos en Estados UnidosACI Prensa· Jun 3, 2026
- Mistral defiende el uso de la IA en la guerra y rechaza las críticas del papa LeónEl Economista· May 28, 2026
- Axtel operará data center del Tec de Monterrey durante 12 añosMilenio· Apr 22, 2026
- Madrid albergará un enorme centro de datos de Microsoft: ubicación y todo lo que se sabeEl Confidencial· Apr 21, 2026
- El Miguel Delibes funcionará como un gran centro de datos durante la jornada electoral con profesionales, seguridad y agentes del CNIValladolid Plural· Mar 13, 2026
See something wrong or missing on this page? Suggest a correction.