Mapped (unverified)colocation
MTP Sites Leon Edge
León, Guanajuato, Mexico
Source: Primary source
MTP Sites Leon Edge is a mapped data center in Guanajuato, Mexico. It runs on Mexico's grid, which was 74% fossil-fuelled at 474 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
474 gCO₂/kWh
Clean electricity
26%
Region
Guanajuato
Overview
source: linkMTP Sites — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
474 gCO₂/kWh
Clean electricity
26%
Fossil electricity
74%
National grid context, not this facility's own metering. Full country picture: Mexico data centers.
In the news
source: Google News (local + English)- IGNIS y Acciona se unen para construir un centro de datos en SegoviaData Center Dynamics· Aug 10, 2026
- Valladolid atrae uno de los mayores centros de datos del paísEl Día de Valladolid· Aug 7, 2026
- El auge de la IA y de los centros de datos impulsan a la industria del enfriamiento en Méxicodiario.elmundo.sv· Aug 6, 2026
- DC Mudarra proyecta un centro de datos en Valladolid con una inversión de hasta 2.000 millonesEjePrime· Aug 4, 2026
- Castilla y León entra en la carrera de los centros de datos con un importante proyecto de 1.600 millonesEl Confidencial· Aug 1, 2026
- Las advertencias de León XIV sobre la IA llegan en pleno auge de los centros de datos en Estados UnidosACI Prensa· Jun 3, 2026
See something wrong or missing on this page? Suggest a correction.