Mapped (unverified)colocation
moji1
Nanterre, Île-de-France, France
Source: Primary source
moji1 is a mapped data center in Île-de-France, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Île-de-France
Overview
source: linkmoji — colocation facility (7 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Lyon accélère sur les petits data centersLes Echos· Sep 25, 2026
- Alsace. Le spécialiste des serveurs informatiques 2CRSI surfe sur la vague de l’IADNA.FR· May 24, 2026
- De la Société générale à la DGSI, les entreprises françaises doivent boycotter PalantirLibération· May 6, 2026
- Un data center « responsable » à Bron, est-ce vraiment possible ?Tribune de Lyon· Mar 31, 2026
- Gilles Gache-Cazalis, adjoint au maire de Nanterre, en charge de l’espace public : "un data center s’inscrit, tout d’abord, dans un projet de ville"Immoweek· Mar 25, 2026
- Basket : Victor Wembanyama investit pour faire du Nanterre 92 un « club référence »Les Echos· Mar 6, 2026
See something wrong or missing on this page? Suggest a correction.