Mapped (unverified)colocation
Mediactive Mn3
Choisy-le-Roi, Île-de-France, France
Source: Primary source
Mediactive Mn3 is a mapped data center in Île-de-France, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Île-de-France
Overview
source: linkMEDIACTIVE GROUP — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Industrie, data center, ferme d’aquaponie… le destin des réserves foncières autour de l’aéroport d’Orly se dessineLe Parisien· Dec 11, 2025
- Vitry-sur-Seine : une pétition contre le projet de data center à la place du dépôt pétrolierCitoyens.com· Nov 18, 2025
- Val-de-Marne : avis favorable pour la construction controversée d’un data center dans cette communeOuest-France· Aug 28, 2025
- Le dépôt pétrolier géant de Vitry va plier bagageLe Parisien· Jun 5, 2025
- Consultation sur le projet de data center dans le parc Icade de RungisCitoyens.com· Apr 8, 2025
- Immobilier : gastronomie, coliving, musique… après le départ de Lidl, Icade Orly-Rungis sort du tout bureauLe Parisien· Dec 10, 2024
See something wrong or missing on this page? Suggest a correction.