Maxcom is a mapped data center in Ciudad de México, Mexico. It runs on Mexico's grid, which was 74% fossil-fuelled at 474 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
474 gCO₂/kWh
Clean electricity
26%
Region
Ciudad de México
Overview
source: linkMacom Telecomunicaciones — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
474 gCO₂/kWh
Clean electricity
26%
Fossil electricity
74%
National grid context, not this facility's own metering. Full country picture: Mexico data centers.
In the news
source: Google News (local + English)- Los centros de datos, la IA y la transición energéticaGrupo Animal· Aug 20, 2026
- Claudia Sheinbaum: "México no debe ser el centro de datos de otros países"Xataka México· Aug 19, 2026
- México no será hub global de centros de datos: CSPEl Economista· Aug 19, 2026
- Sheinbaum: México no debe ser centro de datos de otros paísesAudiorama Comunicaciones· Aug 18, 2026
- México pone límites a expansión de centros de datos por consumo de aguaMaya Comunicación· Aug 18, 2026
- México no debe instalar centros de datos para otros países: SheinbaumFortuna y Poder· Aug 18, 2026