Mapped (unverified)colocation
Matrix Data Center JK1 (MDC JK1)
Jakarta Utara, Daerah Khusus Ibukota Jakarta, Indonesia
Source: Primary source
Matrix Data Center JK1 (MDC JK1) is a mapped data center in Daerah Khusus Ibukota Jakarta, Indonesia. It runs on Indonesia's grid, which was 82% fossil-fuelled at 681 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
681 gCO₂/kWh
Clean electricity
18%
Region
Daerah Khusus Ibukota Jakarta
Overview
source: linkPT. NAP Info Lintas Nusa — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
681 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: Indonesia data centers.
In the news
source: Google News (local + English)- Tanpa Aturan Ketat Soal Listrik dan Air, RI Berisiko Jadi Penanggung Beban Ekologis Industri Data CenterKedai Pena· Jun 16, 2026
- STT GDC Percepat Ekspansi Kampus Pusat Data STT Jakarta Campus untuk Mendukung Masa Depan AI dan DigitalSidakNews.com· Jun 10, 2026
- Airlangga: Indonesia-Singapura dorong pusat data regionalANTARA News Manado· Jun 9, 2026
- PLN Dukung Ekspansi Data Center AI BDx, Siapkan Pasokan Listrik 1,2 GW untuk Perkuat Ekosistem Digital Indonesia - Poros Jakartaporosjakarta.com· Jun 2, 2026
- Gaet Pengusaha Hebei China, Menko Perekonomian Dorong Sulawesi Utara Jadi Pusat Data GlobalAFU.id· May 29, 2026
- LG Energy Solution Raih Kontrak Baterai US$1,6 Miliar untuk Proyek Listrik dan Data Center AI di ASVOI.id· May 29, 2026
See something wrong or missing on this page? Suggest a correction.