Mapped (unverified)colocation
Matrix Data Center BM1 (MDC BM1)
Batam, Kepulauan Riau, Indonesia
Source: Primary source
Matrix Data Center BM1 (MDC BM1) is a mapped data center in Kepulauan Riau, Indonesia. It runs on Indonesia's grid, which was 82% fossil-fuelled at 681 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
681 gCO₂/kWh
Clean electricity
18%
Region
Kepulauan Riau
Overview
source: linkPT. NAP Info Lintas Nusa — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
681 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: Indonesia data centers.
In the news
source: Google News (local + English)- Deretan Kota dengan Jumlah Pusat Data Center Terbanyak, Batam KeduaDataIndonesia· Jun 19, 2026
- Video: Saingi Johor, BKPM Dorong Batam Pusat Data Terkemuka di ASEANCNBC Indonesia· Jun 17, 2026
- Data Center Terisi Penuh Sebelum Beroperasi, Telkom Percepat Ekspansi Kapasitas NeutraDC di Batamkonstruksimedia.com· Jun 16, 2026
- Nilai investasi pusat data di BatamANTARA Foto· Jun 16, 2026
- The value of data center investment in BatamANTARA Foto· Jun 16, 2026
- Pengamat Pertanyakan Langkah Pemerintah Bangun Data Center: Apa Indonesia Siap?Kedai Pena· Jun 16, 2026
See something wrong or missing on this page? Suggest a correction.