Mapped (unverified)colocation
Matrix Data Center BM1 (MDC BM1)
Batam, Kepulauan Riau, Indonesia
Source: Primary source
Matrix Data Center BM1 (MDC BM1) is a mapped data center in Kepulauan Riau, Indonesia. It runs on Indonesia's grid, which was 82% fossil-fuelled at 681 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
681 gCO₂/kWh
Clean electricity
18%
Region
Kepulauan Riau
Overview
source: linkPT. NAP Info Lintas Nusa — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
681 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: Indonesia data centers.
In the news
source: Google News (local + English)- Prospek Cerah Saham yang Bertautan dengan Data Center di Tengah Freeze MSCISWA.co.id· Aug 29, 2026
- Telkom (NeutraDC) Bakal Bangun Data Center di ManadoBisnis Tekno· Aug 26, 2026
- TLKM, ISAT, DSSA, DCII Berebut Pasar Data Centerinvestor.id· Aug 23, 2026
- Industri Pusat Data Batam Tumbuh 22 Persen, Lampaui NasionalEmitennews.com· Aug 21, 2026
- Bisnis Data Center Indonesia Diproyeksi Tumbuh Pesat, TLKM dan ISAT Jadi Pilihankontan.co.id· Aug 21, 2026
- Habib Aboe Bersama BKSAP Dalami Posisi Batam Jadi Data Center ASEANRM.ID· Aug 20, 2026
See something wrong or missing on this page? Suggest a correction.