Mapped (unverified)colocation
Malmö/B
Malmö, Skåne län, Sweden
Source: Primary source
Malmö/B is a mapped data center in Skåne län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Skåne län
Overview
source: linkNational Post and Telecom Agency — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- Skanska bygger datacenter i Finland för 830 miljoner kronorFastighetssverige· Aug 26, 2026
- Skanska får finsk datacenterorderByggindustrin· Aug 26, 2026
- EU-regler ska hjälpa datacenter minska energislöseriDagens Fastigheter· Aug 23, 2026
- Skanska efter jättekontraktet i USA: "Ser ingen avmattning för datacenter"Fastighetssverige· Aug 21, 2026
- INSÄNDARE: Vill vi ha hyperstora datacenter i Skåne?Sydsvenskan· Aug 18, 2026
- Atlas Copco rusar – nästa steg är rymdenAftonbladet· Jul 16, 2026
See something wrong or missing on this page? Suggest a correction.