Mapped (unverified)colocation
LVT Novo Hamburgo (Brasil TecPar)
Novo Hamburgo, Rio Grande do Sul, Brazil
Source: Primary source
LVT Novo Hamburgo (Brasil TecPar) is a mapped data center in Rio Grande do Sul, Brazil. It runs on Brazil's grid, which was 11% fossil-fuelled at 110 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
110 gCO₂/kWh
Clean electricity
89%
Region
Rio Grande do Sul
Overview
source: linkBrasil TecPar — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
110 gCO₂/kWh
Clean electricity
89%
Fossil electricity
11%
National grid context, not this facility's own metering. Full country picture: Brazil data centers.
In the news
source: Google News (local + English)- "Talvez seja mais um dos maiores investimentos da prefeitura": Conheça projeto com investimento de R$ 10 milhões que pretende desburocratizar processos em Novo Hamburgoabc+· Oct 9, 2026
- Caras de TI viram sócios na BriviaBaguete· Sep 25, 2025
- Recuperado da enchente, TRF-4 instala juízo das garantias e plenário virtualConsultor Jurídico· Sep 17, 2025
- EXPOINTER 2025: BRDE anuncia mais R$ 15 milhões para provedores de internetRádio Guaíba· Sep 5, 2025
- Um dos maiores bancos do país abre 600 empregos no RSGZH· Sep 25, 2024
- Novo data center é anunciado no 4º Distrito de Porto AlegreJornal do Comércio· Sep 4, 2023
See something wrong or missing on this page? Suggest a correction.